Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Elections
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

Mumbai’s Bandra East–Kalanagar skywalk — 680m pedestrian link races toward Dec 31 opening

Richa Pinto
| TNN | Last updated on - Dec 10, 2025, 15:07 IST
Comments
Share
1/8

Skywalk construction nears completion

Work on the new skywalk linking Bandra East station and Kalanagar junction is 90% complete, with BMC confident of meeting the December 31 deadline. Engineers said most structural components are finished, and remaining tasks include surface works, railing installation and final safety checks.

2/8

New link spans 680 metres

The upcoming skywalk stretches 680 metres and is 6 metres wide, offering significantly improved pedestrian capacity. The design aims to ease heavy footfall from the station area toward Kalanagar and BKC, ensuring smoother, safer movement for commuters once operational.

3/8

Multiple access points provided

The structure includes escalators at two locations and staircases at three points, giving commuters multiple entry and exit choices. These access features are planned to reduce crowding, allow faster dispersal and improve accessibility for senior citizens and daily office-goers.

4/8

Built to modern safety standards

The skywalk is being constructed with upgraded materials, stronger support beams and improved lighting to enhance safety. BMC engineers said anti-skid flooring and wider walkways will help prevent accidents, especially during monsoon, when pedestrian routes typically become slippery

5/8

Old skywalk dismantled for flyover

The previous Bandra East skywalk, built in 2008 and stretching 1.3km, was demolished in 2021. It was removed to clear space for the Kalanagar flyover arm heading toward BKC, a crucial link meant to reduce bottlenecks at one of the busiest junctions in the area.

6/8

Relief expected for peak-hour rush

Heavy crowds at Bandra East station often spill onto narrow footpaths and service lanes. The new skywalk is expected to divert thousands of pedestrians away from busy road sections, reducing conflicts between vehicles and foot traffic during peak commuting hours.

7/8

New design improves connectivity

The revamped skywalk is designed to integrate better with surrounding infrastructure, offering seamless movement between the station, Kalanagar junction and onward routes to BKC. Officials expect the upgraded layout to cut walking time and decongest vehicular traffic below.

8/8

Final works progressing swiftly

BMC officials stated that installation of escalators, finishing of stairways, painting and electrical wiring are in the final stages. Coordination with traffic police is underway to plan safe access points, ensuring that the skywalk can open to the public without delays.

Top Comment
T
Trouble Shooter
173 days ago
the real reason - we have no courage to remove the illegal constructions between WE highway and Bandra East Rlyh station. These people have encroached 100% on entire land and no government has the capability to remove encroachment and hence they have built walkway to circumvent the illegal encroachments by musalaman public
Read allPost comment
Photostories
  • 10 beautiful indoor plants for your desk, bedside, and centre table that can help you feel happier, calmer, and less stressed
  • 8 expressway corridors creating new real estate opportunities
  • The joint pain mistake millions make, and why doctors want it to stop
  • Thought of the day inspired by the Bhagavad Gita: "Attachment creates fear; acceptance creates peace"
  • 6 Beautiful plants that thrive with very little sunlight
  • Forget chemo or immunotherapy: ‘Revolutionary’ cancer jabs destroy tumours in treatment-resistant cases in trial
  • From British rejection to fashion revolution: The story behind India’s most iconic saree moment
  • Morning affirmation at 5 am: The early-morning words that can reset your mindset
  • Brad Pitt to Tom Holland: Hollywood actors who spoke about addiction and sobriety
  • Out of the shadows: The Women who made Madhubani art global
Explore more Stories
  • 12
    ​Meet the 35 MLAs sworn in as ministers in West Bengal's massive cabinet expansion​
  • 8
    Vande Bharat trial run on Bengaluru–Mangaluru route in June; know route and stops
  • 7
    Beneath Chennai's iconic Marina Beach, a new metro chapter is taking shape
  • 7
    ​From a Bakrid invite to murder: Inside the Ghaziabad teen stabbing case
  • 10
    Why Air India’s Kalina residential colonies are emptying out in Mumbai after 70 years
Up Next
  • News
  • /
  • City
  • /
  • Mumbai
  • /
  • Mumbai’s Bandra East–Kalanagar skywalk — 680m pedestrian link races toward Dec 31 opening
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © Jun 2, 2026, 08.35AM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service