Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Elections
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

Tunnels, machines, and milestones: Mumbai gears up as TBM launches for 9.2km underground link

SL Shanth Kumar
| TNN | Last updated on - Dec 3, 2025, 14:39 IST
Comments
Share
1/10

Tunnelling kick-off

The mmrda is preparing to begin tunnelling work for the new east–west underground corridor in south mumbai. The first tunnel boring machine will start operations at orange gate. The launch marks a major milestone for the project. Senior state leaders will attend the ceremony. The event will formally initiate excavation. Work will gradually progress toward marine drive.

2/10

Major engineering milestone

Launching the tbm marks the transition from planning to major physical construction. The machine will carve through complex geological layers beneath the city. Engineers have conducted detailed soil studies to prepare. The operation requires precision and monitoring. This stage is considered one of the toughest. Successful tunnelling is crucial for project timelines.


3/10

CM Fadnavis launches tunnelling work today

Maharashtra chief minister Devendra Fadnavis on Tuesday marked the launch of a tunnel boring machine (TBM) for Mumbai’s planned 9.2km east–west underground tunnel. The event at Orange Gate signals the beginning of excavation work for the ambitious project, which aims to improve connectivity between the eastern waterfront and Marine Drive.

4/10

Key project alignment

The tunnel will link orange gate on the eastern side to marine drive on the western coast. This connection is expected to significantly reduce cross-city travel time. The corridor provides an alternative to congested surface roads. Its design includes deep underground passages. The alignment has been selected to minimise surface disruptions. It will improve east–west connectivity in a high-density zone.


5/10

Urban mobility impact

The tunnel is expected to ease east–west bottlenecks drastically. Commuters often face significant delays between these two zones. The underground route will ensure smooth, uninterrupted movement. It will reduce vehicular load on key arterial roads. The project forms part of a broader mobility overhaul. It will complement upcoming metro and coastal infrastructure.

6/10

Logistics and material handling

The tunnelling process will generate large quantities of excavated earth. Dedicated transport routes are set for debris removal. Storage spaces near the site have been secured. Equipment supply chains have been readied for continuous operations. The mmrda aims to avoid downtime due to logistics. The tunnelling schedule depends on smooth material flow.

7/10

Safety and monitoring

Advanced sensors will track ground stability during excavation. Control rooms will monitor the tbm’s movement in real time. Engineers will evaluate pressure, vibration, and machine speed. Safety zones have been created around the launch area. Workers are being trained for emergency situations. Regular audits will ensure adherence to safety protocols.


8/10

Environmental considerations

Construction teams have planned measures to limit dust and noise. Tunnel boring reduces surface-level disruption. The underground method helps protect heritage precincts. Authorities are monitoring environmental compliance closely. Waste material will be transported in controlled batches. The design also includes safety systems for long-term operation.

9/10

MMRDA’s execution strategy

The agency has mobilised teams for excavation, logistics, and safety coordination. Multiple contractors are involved in the implementation. The project requires synchronised operations at both ends. Authorities are coordinating with civic and utility bodies. A detailed schedule will guide each tunnelling phase. The mmrda is aiming for steady progress once the machine enters full operation.

10/10

Timeline and expectations

Officials expect the tunnelling process to progress steadily over the coming months. Completion depends on technical challenges underground. The tunnel will be a key link in mumbai’s evolving transport network. Authorities are optimistic about on-time delivery. The project is anticipated to reshape regional connectivity. It reflects long-term planning for urban mobility demands.

Start a Conversation

Post comment
Photostories
  • 5 national parks in the USA perfect for wildlife lovers and the best time to visit them
  • Katrina Kaif’s ‘Uncha Lamba Kad’ outfit is trending again after the revamped version starring Disha Patani went viral for all the wrong reasons
  • Paratha to Raita: 9 ways to enjoy moringa leaves during summer months
  • Rags to Riches stories of Hollywood: Dwayne ‘The Rock' Johnson to Robert Downey Jr.
  • Brad Pitt to Tom Holland: Hollywood actors who spoke about addiction and sobriety
  • Tennis legend Serena Williams' $10 million Florida mansion is a luxury retreat with a secret karaoke room, infinity pool but no tennis court
  • Setting up your living room? The 3-5-7 rule interior designers don’t want you to know
  • 6 fruit peels you should stop throwing away and why
  • Meet Calmaria Incredibilis: The two-headed snake from China that fooled scientists for years until DNA proved it!
  • After RCB’s big IPL win, Anushka Sharma keeps things traditionally rooted in this Anavila suit for her Vrindavan visit with Virat Kohli
Explore more Stories
  • 8
    ​How Harbour Line western extension will change Mumbai’s rail connectivity
  • 9
    Annamalai plans secular-regional party with national outlook, redefined Dravidian vision
  • 12
    ​Meet the 35 MLAs sworn in as ministers in West Bengal's massive cabinet expansion​
  • 8
    Vande Bharat trial run on Bengaluru–Mangaluru route in June; know route and stops
  • 7
    Beneath Chennai's iconic Marina Beach, a new metro chapter is taking shape
Up Next
  • News
  • /
  • City
  • /
  • Mumbai
  • /
  • Tunnels, machines, and milestones: Mumbai gears up as TBM launches for 9.2km underground link
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © Jun 3, 2026, 06.06AM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service