Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Elections
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

Metro 13 takes shape: 24.5km Bhayander-Virar corridor set to recast commuting in western Mumbai

TOI City Desk
| TIMESOFINDIA.COM | Last updated on - May 14, 2026, 14:05 IST
Comments
Share
1/7

Metro line 13 project

The proposed Metro Line 13 corridor between Bhayander and Virar has moved a step forward after the revised Detailed Project Report (DPR) was submitted to the Maharashtra government for approval.

2/7

Underground section added

The updated plan includes a 3.25-km underground stretch between Vasai and Nalasopara, aimed at reducing displacement and rehabilitation issues in densely populated residential pockets along the route.

3/7

Sharp rise in cost

The estimated cost of the project has increased significantly to Rs 17,724 crore, compared to the earlier estimate of around Rs 6,900 crore, mainly due to revisions in alignment and underground construction work.

4/7

Route and structure

The Metro corridor will span 24.9 km in total, with 21.65 km planned as an elevated section and the remaining 3.25 km underground.

5/7

Stations planned

A total of 17 stations have been proposed on the corridor, including 14 elevated stations and three underground stations at Vivek Fire Brigade, Chole Gaon and Papdi.

6/7

Network integration

Metro Line 13 will connect with Metro Line 9 at Bhayander, enabling smoother access towards Dahisar, Andheri East and Gundavali through the wider Mumbai Metro network.

7/7

Key infrastructure feature

The project includes a proposed double-decker bridge over Vasai creek, with a lower deck for road traffic and an upper deck for metro services. (All Images used for representational purpose only)

Top Comment
S
Sunil
10 days ago
If MMRDA has the brains it will connect the virar metro line to the virar bullet train station. And hopefully to the vadhwan port, whenever it's ready. . Urgently needed bhayander-vasai bridge is a massive neccesity to avoid the third-rate western"express"highway.
Read allPost comment
Photostories
  • 5 foods that become surprisingly tasty when slightly burnt
  • Study reveals nearly 40% of cancers may be preventable; doctor explains how everyday habits are raising the risk
  • NYC Mayor Zohran Mamdani brings football and fashion together in an Arsenal thobe for Eid celebrations
  • Morning affirmation at 5 am: The quiet ritual helping people feel mentally stronger
  • Discovering India’s only snake-free region
  • 10 famous snake parks and zoos in the USA every wildlife traveller should visit and how to reach here
  • "Egg is the worst thing you can..." Sadhguru shares 3 traditional South Indian vegetarian dishes rich in protein and vitamin B12
  • 5 most iconic Katrina Kaif movie looks that are making a comeback online
  • 10 toxic habits you think are normal, but they're holding you back
  • Indoor plants that you can grow without soil
Explore more Stories
  • 8
    Mumbai AC local sees 1.5 crore passengers in 5 months — here’s why ridership is soaring
  • 10
    Hugs & hot idlis: Bonhomie before the big call? DK Shivakumar touches Siddaramaiah’s feet
  • 8
    Mira Road housing society turns communal faultline amid Bakrid sacrifice row
  • 10
    After 11 years of traffic snarls, Hope Farm underpass work finally takes off in Bengaluru
  • 7
    Back on track: Mumbai Monorail gears up for June restart, trial runs begin on Wadala stretch
Up Next
  • News
  • /
  • City
  • /
  • Mumbai
  • /
  • Metro 13 takes shape: 24.5km Bhayander-Virar corridor set to recast commuting in western Mumbai
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © May 29, 2026, 10.33AM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service