Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Elections
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

​How Harbour Line western extension will change Mumbai’s rail connectivity

TOI City Desk
| TIMESOFINDIA.COM | Last updated on - Jun 2, 2026, 16:10 IST
Comments
Share
1/8

Harbour Line western extension project gains pace

Western Railway has floated an Rs 86.5-crore civil works tender for the proposed Harbour Line extension between Goregaon and Borivli under MUTP-3A. (Representational image)

2/8

WR invites bids for key infrastructure works

The tender package includes earthwork, bridge construction and allied infrastructure works for the proposed Harbour Line extension between Goregaon and Borivli. (Representational image)

3/8

Goregaon-Borivli Harbour Line extension estimated at Rs 898 crore

The project cost includes Rs 728 crore for civil engineering works, Rs 88 crore for electrical works and Rs 82 crore for signalling and telecom. (Representational image)

4/8

Project includes construction of 18 bridges

Authorities plan to build two major bridges and 16 minor bridges as part of the proposed Harbour Line extension between Goregaon and Borivli. (Representational image)

5/8

Land acquisition remains a key challenge

The project requires 3,688 square metres of land, including 3,389 square metres of private land and 299 square metres of government land. (Representational image)

6/8

Rehabilitation process underway for PAPs

Authorities identified 520 PAPs on railway land. Rehabilitation units have been allotted to 178 PAPs, while 141 PAPs are affected on private land. (Representational image)

7/8

Key challenges remain for Harbour Line extension

Completion of land acquisition, rehabilitation of remaining PAPs, removal of encroachments and approval of pending bridge drawings remain major challenges. (Representational image)

8/8

Latest tender floated on May 27

The Rs 86.51-crore tender covers rail formation, bridges, side drains, retaining structures and boundary walls for the Harbour Line extension project. (Representational image)

Start a Conversation

Post comment
Photostories
  • 5 countries across the world that are free of snakes
  • 5 subtle signs Lord Hanuman may be guiding and protecting you
  • Is refined sugar the new tobacco? Why doctors are comparing everyday sugar consumption to smoking habits
  • Archana Puran Singh goes house hunting to buy a new mansion in Madh Island; shares a glimpse of the luxurious property
  • From KL Rahul to Sunil Chhetri: 5 athletes who own luxurious homes in Bengaluru
  • Long before self-love became a trend, Sushmita Sen practiced it: 5 traits that continue to inspire young women
  • From bird feeders to herb gardens: 7 ways to repurpose old flower pots
  • 7 of the cutest animals on earth (and why they’re so irresistible)
  • 4 warning signs most men ignore until it’s too late: US heart surgeon Jeremy London on early health red flags
  • You can be thin, but still clinically obese: BMI underestimates obesity levels, says study
Explore more Stories
  • 9
    Annamalai plans secular-regional party with national outlook, redefined Dravidian vision
  • 12
    ​Meet the 35 MLAs sworn in as ministers in West Bengal's massive cabinet expansion​
  • 8
    Vande Bharat trial run on Bengaluru–Mangaluru route in June; know route and stops
  • 7
    Beneath Chennai's iconic Marina Beach, a new metro chapter is taking shape
Up Next
  • News
  • /
  • City
  • /
  • Mumbai
  • /
  • ​How Harbour Line western extension will change Mumbai’s rail connectivity
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © Jun 2, 2026, 04.13PM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service