Your Privacy is Important to us

We encourage you to review our Terms of Service, and Privacy Policy.

By continuing, you agree to the Terms listed here. In case you want to opt out, please click "Do Not Sell or Share My Personal Information" link in the footer of this page.

Opt out of the sale or sharing of personal information

We won't sell or share your personal information to inform the ads you see. You may still see interest-based ads if your information is sold or shared by other companies or was sold or shared previously.

Continue on TOI App
Open App
Login for better experience!
Login Now
Welcome! to timesofindia.com
TOI INDTOI USTOI GCC
TOI+
  • Home
  • Live
  • TOI Games
  • Top Headlines
  • India
  • City News
  • Photos
  • Business
  • Real Estate
  • Entertainment
  • Movie Reviews
  • Lifestyle
  • Podcasts
  • Elections
  • Web Series
  • Sports
  • TV
  • Food
  • Travel
  • Events
  • World
  • Music
  • Astrology
  • Videos
  • Tech
  • Auto
  • Education
  • Log Out
Follow Us On
Open App
  • News
  • Videos
  • India
  • Elections
  • World
  • City
  • Tesseract
  • Life & Style
  • Entertainment
  • Business
  • Tech
  • TOI Games
  • Cricket
  • Sports
  • TV
  • Web Series
  • Education
  • Speaking Tree
  • Success Story of Visionary Leaders
  • TOI Newsletters
  • Health
  • Real Estate
  • Legal
  • Defence
  • Women

Giant cranes, road to change: Bengaluru’s Hebbal flyover ramp work begins (See pics)

Chethan Shivakumar
| TNN | Last updated on - May 16, 2025, 10:34 IST
Comments
Share
1/7

Hebbal flyover ramp work cleared

BDA gets SWR’s nod to launch a 33.5-metre girder over Hebbal railway line, part of the long-pending ramp extension of the Hebbal flyover.


2/7

Rail traffic block: May 17–20

SWR will halt train operations for three hours nightly over four days to allow girder placement above the active Yeshwantpur–Omalur rail section.


3/7

Partial closure of Hebbal flyover

During the work, parts of the Hebbal flyover will be closed. Traffic from KIA may be rerouted via BEL Circle or Nagawara to avoid bottlenecks.


4/7

Traffic diversion plans underway

BDA is working with police to keep at least one lane open towards Mehkri Circle to minimize traffic chaos during night construction hours.

5/7

Girder launch strategy set

Seven girders to be launched in four nights using eight cranes. Utility removal and site prep are already complete at the junction.


6/7

Project aligned with rail expansion

The design accommodates future additions of up to six railway lines under the Bengaluru Suburban Rail Project, ensuring no interference.

7/7

Ramp now for Nagawara traffic only

To avoid congestion near Esteem Mall, the ramp will now serve vehicles from Nagawara and the NH service road, not those from KIA on Ballari Road.


Start a Conversation

Post comment
Photostories
  • Morning affirmation at 5 am: Why some people are replacing scrolling with affirmations
  • Tears, cheers and fireworks: King Kohli reigns again as RCB defend IPL crown in Ahmedabad
  • What happens when you drink coconut water for 15 days daily in summer season and foods to pair with it
  • Divyanka Tripathi shares emotional moments from twin boys' birth; Delivery room glimpses to Harshdeep Kaur singing “Chanda Hai Tu” for the newborns
  • 'Stranger Things' to 'Game of Thrones': Series that gained popularity owing to their conspiracy theories
  • 7 myths about obesity that need to be left behind
  • From a Bakrid invite to murder: Inside the Ghaziabad teen stabbing case
  • 6 types of litchi available in India and how to pick the sweetest one at the market
  • From T. Rex to Spinosaurus: Meet the most terrifying dinosaurs to ever walk the earth, dominating the prehistoric world with unmatched size, strength, and hunting power
  • Kriti Sanon is serving flirty luxe with emerald envy in this Rs 67,000 designer mini dress for ‘Cocktail 2' promotions
Explore more Stories
  • 7
    ​From a Bakrid invite to murder: Inside the Ghaziabad teen stabbing case
  • 10
    Why Air India’s Kalina residential colonies are emptying out in Mumbai after 70 years
  • 8
    How 34.2-km Metro Line 5 corridor is reshaping connectivity across eastern MMR
  • 8
    ​How Chennai’s young homebuyers are reshaping the city’s real estate map with a suburb shift
  • 8
    Airport shake-up: Bengaluru overtakes Mumbai in domestic traffic battle
Up Next
  • News
  • /
  • City
  • /
  • Giant cranes, road to change: Bengaluru’s Hebbal flyover ramp work begins (See pics)
About UsTerms Of UsePrivacy PolicyCookie Policy

Copyright © Jun 1, 2026, 05.29AM IST Bennett, Coleman & Co. Ltd. All rights reserved. For reprint rights: Times Syndication Service